Road Closure Notice: Dunsmuir Avenue from October 4 to 18, 2021
Posted on
From October 4 and 18, 2021, for the purpose of installing new BC Hydro and Telus infrastructure, a temporary road and sidewalk closures will take place on Dunsmuir Avenue for areas between Second and Third Street as follows:
Friday Oct 15th | Both sidewalks open – paving postponed due to weather |
Monday Oct 18th | Full Road closure for paving. Both sides of sidewalks open. Project completed end of day. |
Any concerns the following contacts are available:
- Civil Contractor: Leighton Contracting 250-338-6460
- General Contractor: Rideout Construction 250-207-0415
- Village Office at (250) 336-2291 or via email info@nullcumberland.ca